(PECL paradox >= 1.4.0)
Converts a date into a string.
string px_date2string ( resource $pxdoc, int $value, string $format )
Turns a date as it stored in the paradox file into human readable format. Paradox dates are the number of days since 1.1.0000. This function is just for convenience. It can be easily replaced by some math and the calendar functions as demonstrated in the example below.
Parameters:
pxdoc
Resource identifier of the paradox database as returned by px_new().
value
Value as stored in paradox database field of type PX_FIELD_DATE.
format
String format similar to the format used by date(). The placeholders support by this function is a subset of those supported by date() (Y, y, m, n, d, j, L).
Returns:
Returns TRUE
on success or FALSE
on failure.
Examples:
Turn a paradox date into a human readable form
<?php $px = px_new(); /* make up a date as it could be stored in */ /* a date field of a paradox db. */ /* 700000 days since 1.1.0000. */ $days = 700000; /* Use the calendar functions to print a */ /* human readable format of the date */ echo jdtogregorian($days+1721425)."\n"; /* px_date2string() outputs the same */ echo px_date2string($px, $days, "n/d/Y")."\n"; px_delete($px); ?>
The above example will output:
7/15/1917 7/15/1917
See also:
Please login to continue.